The development objective of the Electric Power Project for Myanmar is to increase capacity and efficiency of gas-fired power generation and strengthen the institutional capacity of the Ministry of electric power and the Myanmar electric power enterprise. There are two components to the project. The first component of the project is supply and installation (S&I) of a Combined Cycle Gas Turbine (CCGT) power plant at the existing Thaton Gas Turbine (GT) station. This is the main component of the project is the expansion of the Thaton GT station into a new CCGT power plant. A modern, high-efficiency, low-emissions CCGT power plant will comprise two 40 Megawatt (MW) gas turbines with inlet air chillers, one steam turbine of 26 (MW), a heat recovery steam generator (HRSG) and air-cooled steam condenser. The second component of the project is technical assistance component focused on institutional and capacity building support to Ministry of Electric Power (MOEP) and Myanmar Electricity Power Enterprise (MEPE). This component will provide technical assistance and advisory services to MOEP and MEPE in two main areas. The first area of support is related to the capacity building for policy making and regulation in the power sector including.

Publication date
Type of publication
Project
CTCN Keyword Matches
Myanmar
Small-scale Combined Heat and Power
Single cycle to combined cycle power generation