
The Ringsjö plant draws its water from Lake Bolmen through a tunnel that was opened in 1987. The plant regularly delivers 1,600 litres of water per second to 16 different municipalities in the Skåne Region with a maximum capacity of 2,400. The plant itself was opened in 1963 and completely rebuilt between 1994 and 1997, when a new lamella sedimentation basin was added. The process combines lamella sedimentation with a sequence of filters before the final step of pH adjustment with lime water takes place.
The Ringsjö plant draws its water from Lake Bolmen through a tunnel that was opened in 1987. The plant regularly delivers 1,600 litres of water per second to 16 different municipalities in the Skåne Region with a maximum capacity of 2,400. The plant itself was opened in 1963 and completely rebuilt between 1994 and 1997, when a new lamella sedimentation basin was added. The process combines lamella sedimentation with a sequence of filters before the final step of pH adjustment with lime water takes place.
Sustainable Business Hub