Minimizing energy consumption (or CO2 emission) by optimizing equipment selection and load distribution of energy conversion and storage facilties which comprise utility plants.
Cost of primary energy in utility plants could reach as much as 10 million USD/yr. Typical application includes refineries, petrochemical, paper, cement, textiles, fertilizer, large FA plants, district heating and cooling systems.
Ministry of Economy, Trade and Industry, Japan
Energy savings of 3-7% of primary energy consumed in the facilities concerned, compared with the case when FEMS is not introduced.
Reduction of energy cost burden of operators.
Calculation of optimal equipment selection and load distribution by mixed integer program or equivalent optimization computation methods, and implementing with guidance or automatic control.
Ca. 0.5 to 2 million USD depending on size and composition.
Ca. 6 months depending on size and composition.
Ministry of Economy, Trade and Industry, Japan
[email protected]
Ministry of Economy, Trade and Industry, Japan